More fuselage progress

Once the fuselage was dry you can start adding cables, pulleys, any wiring, new fuel lines break and rudder pedals elt mounts floorboards, etc. All this was fabricated new on this build

Another shot

Once all that is finished you can start covering the belly.

Then when the glue dries, time to shrink

Then once that's dry and shrunk you can start on the sides.

The hardest part is getting the fabric to lay down nicely at the base of the vertical stabilizer

Start gluing and be sure to keep the seam straight up the spine

Once the glue is dry, its time to tighten it up and get rid of the wrinkles, but that's a post for another day. Stay tuned

.

Featured Posts
Posts Are Coming Soon
Stay tuned...
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • Facebook - White Circle
  • Instagram - White Circle

© 2018 Grass Patch Aero